Driveway Repair

 After more than a decade I have learned a few hard lessons.  First of all,  unless you have use of a small expensive digger, it's a good physical workout. 



Step 1. Place as large a stone as possible in the base off the washout. 

 Step 2: Fill around the base layer and shallow parts of the washout with mid- sized stone. 

 Step 3: Fill to satisfaction with fist sized or smaller stone. 

The theory it's that water will move through the proud construction,  but aft a slower rate and the large stone will anchor the entire construction. 

Comments

Popular posts from this blog

Mango Tree

My Birthday Wishes

Route Planning